All resources
    Net MeteringTGSPDCLPolicy

    Net Metering in Telangana, Explained Simply

    Midwatt·14 February 2026·4 min read

    Net Metering in Telangana, Explained Simply

    Net metering lets your solar system export excess power back to the grid. TGSPDCL credits those units against your consumption, so your bill drops to zero, or close to it.

    Who's eligible

    Any LT consumer with sanctioned load up to 1 MW. Your inverter must be approved and the system must use a bi-directional meter.

    The 5-step application

    1. Submit application with site details and system size
    2. DISCOM technical feasibility check
    3. Sign net metering agreement
    4. Install bi-directional meter
    5. Commissioning + first export reading

    Common mistakes

    • Oversizing beyond sanctioned load (rejection)
    • Skipping CEIG approval for >10 kW
    • Using non-listed inverters
    • DIY-ing the paperwork (delays of 2–3 months)

    We handle every step in-house. You sign, we file.

    Ready for your free savings report?

    We'll show you exact numbers for your roof, with no commitment.

    Get my report